Skip to main content
Emergency Alert

Stage 2 Water Restrictions are in effect

Find my watering schedule »

Find my watering day by address »

(Residential, Commercial and Industrial)



DETOUR MAPS

CCRTA Temporary Bus Stop Closures for Route 27 and 28 »

Beginning Monday, April 5, 2021 CCRTA Bus Routes 27 Leopard and 28 Leopard/Navigation will be temporarily closed for the Bond 2018 Proposition A Reconstruction of Leopard Street from Palm Drive to Nueces Bay. For more information on these bus routes visit the CCRTA website.
 

________

PROJECT FACTS

Project Consultant Architect: HDR, Sam Saldivar P.E.

City Project Manager: Mai-Theresa Bernal, P.E.

Contractor: Clark Pipeline Services

Construction Inspector: Jaime Guiterrez

Anticipated Award Date: March 2021

Anticipated Construction Start: April 2021

Anticipated Completion Date: September 2023

Total Project Value:  $5.2M
 

Additional Notes/Details:

  • Three RTA bus stops and three RTA shelter pads will be constructed.
  • Upgraded traffic signalization and vehicle detection at Nueces Bay Boulevard.
  • Significant stormwater improvements including installing new storm water lines along South Side of Leopard Street, new curb inlets, new manholes and new laterals along the entire project length.
  • Significant wastewater improvements consisting of replacing to thicker walled polyvinyl chloride pipes (SDR 26 PVC) and more resistant fiberglass manholes.
  • Water improvements include replacing to polyvinyl chloride pipes (PVC C900) and install 18 new fire hydrants.
  • Gas valve boxes raised to grade, and gas lines adjusted as necessary.