Skip to main content
Emergency Alert

Stage 2 Water Restrictions are in effect

Find my watering schedule »

Find my watering day by address »

(Residential, Commercial and Industrial)



This project is the phase III of the Padre Island Water Supply program. This program involves the construction of a new 18-inch diameter water transmission main, 8-inch diameter natural gas line, and a 4-inch diameter Municipal Information System (MIS) conduit from Laguna Shores Road to Padre Island to the Sand Dollar Pumping Station.

These new utility services are critical to meet the current and future demands for Padre Island and surrounding communities. Currently, the water service is a single transmission line that cannot be maintained for maintenance or repairs.  The second transmission line allows better reliability and reduced maintenance and repair costs.  Currently, the City provides natural gas feed to the Padre Island community through the pipeline of a third party.  This new gas line will provide a more reliable and cost-effective solution.

Construction started in January 2019 and was completed in October 2019. 

Padre Island Water and Gas Pipeline Extension Location Photo