PROJECT MAPS

Project Overview Phase 2A (Project # 20272) »
A large technical drawing showing the scope of the rebuild.

Project Overview Phase 2B (Project # 20271) »
A large technical drawing showing the scope of the rebuild.

Phase 2B Detour Plan »
A large technical drawing showing the detour plan for Phase 2B. 

________

PROJECT FACTS

Robert Drive to Ennis Joslin Road (Project # 20271)

  • Project Consultant Architect: Connie Ruth Garcia, P.E.
  • City Project Manager: Larry Wenger
  • Contractor: Haas-Anderson Construction, Ltd.
  • Construction Inspector: James Ramirez
  • Anticipated Award Date: September 2020
  • Anticipated Construction Start: October 2020
  • Anticipated Completion: June 2021
  • Duration of Project: 9 months (270 days)
  • Total Project Value: $4,399,728.35
  • View Funding Details »
     

Louisiana Avenue to Robert Drive (Project # 20272)

  • Project Consultant Architect: Connie Ruth Garcia, P.E.
  • City Project Manager: Larry Wenger
  • Contractor: Haas-Anderson Construction, Ltd.
  • Construction Inspector: James Ramirez
  • Anticipated Award Date: September 2020
  • Anticipated Construction Start: October 2020
  • Anticipated Completion: October 2021
  • Duration of Project: 11 months (330 days)
  • Total Project Value: $6,621,583.75
  • View Funding Details »


IH-37 to Lomax Street (Formerly Williams Street) (SPMP)

  • Anticipated Construction Start: January 2020
  • Anticipated Completion: June 2021
  • Total Project Cost: $1,330,000
     

________

PROJECT SCOPE

IH-37 to Lomax St. (Formerly William St.)
Shoreline from IH-37 to Lomax St. (approx. 1.2 miles) will be rehabilitated. The project scope includes a mil and overlay with pavement markings, bike lanes, signage and pedestrian crosswalks.

Lomax St. to Louisiana Ave.
The limits of Shoreline Drive from Lomax to Louisiana (approx. 3 miles) are currently in good condition and will undergo a beautification process. This section of roadway was reconstructed under the Bond 2008 and Bond 2012 program in 2016 and 2018 respectively.

Louisiana Ave. to Ennis Joslin Rd.
The project scope of improvements includes the structural mill and overlay of Ocean Dr. from Louisiana Ave. to Ennis Joslin Rd. (approx. 10.5 miles). This work includes traffic control, pavement markings, bike lanes and new signage. In addition to surface improvements, it also includes a full depth pavement repair and minor utility adjustments.