Skip to main content

This Bond 2014, Proposition 2 project consists of replacing the existing asphalt on Beach Access Road 3A with new concrete and includes grading, slope and soil stabilization, pavement markings and signage.  Improvements also include adjusting the entrance to Beach Access Road 3A to better align with the St. Bartholomew and Windward Drive intersection.  No utility improvements are included in the project except a drainage extension at the intersection.  A separate project will address the replacement of Beach Access Road 2.