Greenwood Drive from Gollihar to Horne Road (Bond 2012) includes full-depth reconstruction of the existing 4-lane road with continuous center turn lane, new curb & gutter, sidewalks, bus stops, pavement markings and striping.  The new pavement will be asphalt.  Utility improvements include water, wastewater, storm water and gas.

The bike route associated with this corridor was included under a separate project for the Hector Garcia Park as a joint MPO/City project and cost sharing under the Transportation Alternative Program.  The bike route project is under design with a construction completion scheduled for spring 2017.