This Bond 2012 Prop 4 project includes:

  • New irrigation system, new top soil, new Bermuda grass,and native low water demand plants and decomposed granite paths
  • Repairs of the existing perimeter walking path
  • Removal of existing play equipment in anticipation of the installation of new equipment. The new equipment will be purchased and installed as a separate contract.
  • Two new concrete pads for new play areas and safety surfacing
  • Lighting for playgrounds and the existing basketball courts
  • Repairs to the existing pavilion roof