Skip to main content

This Bond 2014 Proposition 1 project includes full-depth reconstruction of the existing 5-lane asphalt road with four travel lanes and a continuous center turn lane.  The new asphalt roadway will match the configuration from Kostoryz to Weber, with slightly narrowed lanes.  Improvements include new concrete bus stops, curb & gutter, sidewalks, ADA ramps, cycle tracks, pavement markings, and traffic signal upgrade at the Gollihar/Weber intersection.  Utility improvements include storm water, wastewater, water and gas.