Skip to main content

This Bond 2012 Prop 4 project includes the removal and replacement for approximately 610 linear feet of the existing shoreline protection system at Cole Park. The existing stone and concrete debris system is in poor condition allowing severe erosion that is undermining the shoreline structures and infrastructure.